Deep foundation

For this design, the leader hangs on a special traverse together with the attachment on a crawler crane or duty cycle crawler crane. This so-called swinging leader is especially suitable for installing long piling elements of up to 60 m, as well as for piling work with large inclinations. Therefore, the swinging leader is often used for marine constructions.

    • Animation LRH 600 piling rig

    • Animation: H 15 L hydraulic free-fall hammer

    • LIPOS - Liebherr Positioning System

    • Video - Automatic engine stop control explained

    • Training