Deep foundation

The all-round piling and drilling rig LRB 18 owes its name to the sledge’s travel distance of 18 m. It convinces with compact design and low operating weight, which results in low ground pressure. This ensures quick set-up on site as well as flexibility in transferring the machine between different jobsites. One of the most frequent types of application for the LRB 18 is the installation of sheet piles. Additionally, the machine is suitable for other common foundation work including drilling with continuous flight auger or double rotary head, soil mixing and piling work with a hydraulic hammer...

    01/08
    • Video LRB 16/18 piling and drilling rig

    • Vibro-Assistant

    • MyJobsite – Your work at a glance

    • Liebherr vibrator LV 20

    • LIPOS - Liebherr Positioning System

    • Video - Automatic engine stop control explained

    • Training

    • Drilling assistant

    • Diagnosis screen and remote control

    • Ground Pressure Visualization

    • Obstacle recognition