BRIDGE RENOVATION

Job report Kelly drilling using the LIPOS positioning system

The railway bridge in Koblenz (CH) was renovated

The renovation of the 130-year-old pillars was carried out with four piles each. The piles have a diameter of 1500 mm and a depth between 12 and 20 metres.

Jobsite video

liebherr-lipos-positioning-system-positionierungssystem-koblenz-bridge-6

Using GPS for positioning

The 115-tonne drilling rig worked from a pontoon using the Kelly drilling method. Here LIPOS was imperative for precise positioning of the drilling points.

Get in touch

If you have any further questions, please contact our local sales or service team:

liebherr-lipos-positioning-system-positionierungssystem-koblenz-bridge-4

"We are using GPS for positioning. That works perfectly even though we are under a bridge and close to electric lines. We have never had any interference with the signals and could always work. It’s a mega support for positioning the piles in the water."

Patrick Fuchs

Site Manager, Birchmeier Bau AG