Accuracy at its best
Accurate positioning and precise execution of piling or drilling processes are crucial for the success of deep foundation machines. Using latest satellite navigation technology, Liebherr’s positioning system LIPOS assists the driver in aligning attachments and tools precisely. The compiled data of the piling or drilling processes can be stored for quality assurance and project reporting.
LIPOS video
Demonstration clip of the LIPOS positioning system for accurate alignment of deep foundation machines at the jobsite.
Fully integrated in existing IT solutions
The construction site of the future is going digital. Modern software solutions simplify the processes on the jobsite, streamline documentation efforts and faciltate the interactions between operator and machine.
Video: MyJobsite with LIPOS and PDE
Precise positioning (LIPOS), data recording and transmission (PDE), central data management and analysis (MyJobsite) are all topical issues on the digital construction site.
YOUR BENEFITS
Precision
Pinpoint precision of the drilling and piling work.
Simplicity
The machine operator can quickly select and drive to all piling and drilling points.
Time and cost savings
No pegging out or continuous re-measuring required.
Higher safety
Fewer personnel in the direct vicinity of the machine while positioning.
Consistent data recording
Recording of the drilling points and work processes through the process data recording system PDE.
Quality assurance
Automatic transmission of the data to MyJobsite for visualisation and analysis.
Monitoring
Monitoring the progress of the construction site with real-time information.
Reporting
Generation of comprehensive and informative jobsite reports.