深基础

Listicles | 2024/09/10

The top 3 benefits of Liebherr’s LB 25 drilling rig

Begin your foundation work with Liebherr’s LB 25 drilling rig. A part of our LB series, experience efficiency in your groundbreaking work with multiple applications, an increase in torque and safety, and advanced assistance systems. Need more? Our LB series makes a perfect match for operations by connecting with Liebherr’s concrete crawler pumps. Offering various features to help you drill deeper into your groundbreaking work. These 3 features can assist you in getting the job done.

Kelly drilling is a common dry rotary drilling method and is used for the production of bored piles with a large diameter.

1. Equipped for many applications

The LB 25 is designed to be a high-performance machine with strong winches that perform under even the most difficult conditions. Its versatile design means it’s often used on residential and commercial job sites for a variety of projects including Kelly drilling, continuous flight auger drilling and full displacement drilling.

Multiple design configurations provide solutions to different job site requirements.

2. Flexible design

The LB 25 is engineered to get the job done under a variety of conditions, including height restrictions. With the low-head leader system, the rig will still operate with several applications depending on your specific requirements. This shortened leader is best suited under bridges, below powerlines and other limited height projects. Our Liebherr sales representatives are here to help find you the best configuration for your next job. If height requirements fall under what is possible in the low-head leader configuration, an Ultra Low-Head leader can also be considered.

Maintain control and visualize service and machine data in one location.

3. Innovative drilling data

For various drilling methods, Liebherr provides on-board PDE system that stores drilling and pile data. With information and detailed colored displays, the operator can effectively and efficiently handle the rig, saving you time and money. After data is gathered during the project, operators can utilize our online service MyJobsite to record and analyze the pile information from their machine.