Notícias & press releases

Filtrar relatórios

Período

Assunto

Acessos 201–210 de 847

Comunicados à imprensa | 03/09/2015

Dependable in operation: HKV uses a Liebherr LTM 1300-6.2 to erect a bridge overnight

The motorway section of the A3 between Cologne-Mülheim and Leverkusen is being expanded to eight lanes. However, since the old motorway bridges are not long enough for the expansion, new bridges are needed. As a temporary solution during the construction work, a Liebherr LTM 1300-6.2 mobile crane was used by the company HKV Schmitz + Partner to erect a makeshift bridge overnight. Saiba mais

Comunicados à imprensa | 02/09/2015

Liebherr Seals Its Participation in Clean Sky 2

Three Liebherr companies have confirmed their participation in the Clean Sky 2 Joint Technology Initiative (JTI): While Liebherr-Aerospace Lindenberg GmbH, Lindenberg (Germany), one of the founding members of Clean Sky 2, has recently signed the Grant Agreement Papers, Liebherr-Aerospace Toulouse SAS, Toulouse (France) and Liebherr-Elektronik GmbH, Lindau (Germany) have joined the consortium as affiliates. Saiba mais

Comunicados à imprensa | 02/09/2015

Efficient earthmoving: Liebherr R 926 Compact crawler excavator deployment at Christian Pontiggia

Christian Pontiggia Tief-und Straßenbau GmbH & Co. KG recently opted to buy a Liebherr R 926 Compact crawler excavator as one of the first customers in Germany. Together with the customer, Liebherr analysed the potential applications and configured the work equipment accordingly. The company from the south of the Black Forest employs the new machine chiefly for building sewage ducts, whilst its flexibility means that other earth moving tasks can also be carried out efficiently. Saiba mais

Comunicados à imprensa | 02/09/2015

Saiba mais

Notícias | 28/08/2015

Heavyweight goods handling with two large Liebherr mobile cranes

Maxikraft used two large Liebherr mobile cranes in July to load two condensers and a turbine from low loaders into ships in Dresden's Alberthafen dock.Maxikraft used two large Liebherr mobile cranes in July to load two condensers and a turbine from low loaders into ships in Dresden's Alberthafen dock. Saiba mais

Comunicados à imprensa | 28/08/2015

Maxikraft handles heavyweight goods in Dresden's Alberthafen dock with two large Liebherr mobile cranes

Crane and heavy load logistics contractor Maxikraft used two large Liebherr mobile cranes in July to load two condensers and a turbine from low loaders into ships in Dresden's Alberthafen dock. The challenge was that the giant components had to be moved in tandem hoists between the LTM 1500-8.1 and the LTM 1750-9.1 before they could be lowered into the dock basin. Saiba mais

Notícias | 26/08/2015

Saiba mais

Notícias | 20/08/2015

Major contract: delivery of first Liebherr duty cycle crawler cranes to Turkey

Delivery of the first 20 HS 825 HD duty cylce crawler cranes for Turkey. They are part of a large contract of 51 cranes for the Turkish General Directorate of State Hydraulic Works. Saiba mais

Comunicados à imprensa | 20/08/2015

Major duty cycle crawler crane contract for Liebherr

Liebherr secured a major contract with a Turkish customer comprising 51 HS 825 HD duty cycle crawler cranes at the end of last year. Following a successful acceptance test this spring the first 20 machines left the Liebherr factory in Nenzing for delivery. Saiba mais

Notícias | 19/08/2015

Saiba mais

  • Resultados por página