News & press releases

Filter reports

Period

Subject

Hits 2,351-2,360 of 3,391

Press releases | 04/19/2017

Liebherr to Supply Roll Coupling Components for Combino Low-Floor Trams in Potsdam

Liebherr-Transportation Systems has received an order from Siemens AG, Vienna (Austria) to supply roll coupling components for eight Combino low-floor trams. The trams will be operated by Verkehrsbetriebe Potsdam GmbH, Potsdam (Germany). The order comprises a total of 48 control cylinders, 24 hydraulic accumulators and 24 stop valves, and will be delivered by the end of 2017. Find out more

News | 04/19/2017

Liebherr expands its portfolio with tapered roller bearings

The Liebherr components division expands its large diameter bearings portfolio with tapered roller bearings. This new type of bearings enables further fields of application to be addressed, providing main bearings for tunnel boring machines, Ferris wheels, wind turbines and so on. Find out more

Press releases | 04/18/2017

Brazilian crane contractor LOCAR updates its crane fleet with 4 new Liebherr LTM 1250-5.1 mobile cranes

Crane, heavy haulage and aerial platform contractor LOCAR from Brazil took delivery of four new Liebherr LTM 1250-5.1 mobile cranes at a stroke. New technical developments such as VarioBase®, VarioBallast® and the single-engine concept were important criteria for the purchase. LOCAR has updated its crane fleet with these four new 250-tonne cranes. Find out more

Press releases | 04/18/2017

Liebherr crawler excavator R 926 in action during coastal repair work on the island of Texel

A new Liebherr R 926 crawler excavator has been deployed on the Dutch island of Texel since September 2016. The excavator is used by Dros during coastal repair work, for building dams and canals, as well as for pumping applications. Find out more

Press releases | 04/13/2017

World Premier: First Ever 3D Printed Primary Flight Control Component from Liebherr-Aerospace Flown on an Airbus Aircraft

On March 30th 2017, Airbus successfully flew Liebherr-Aerospace’s 3D printed spoiler actuator valve block on a flight test A380. It is the first 3D printed primary flight control hydraulic component flown on an Airbus aircraft. Find out more

Press releases | 04/13/2017

Milestone anniversary: Liebherr-Werk Bischofshofen GmbH delivers 50,000th wheel loader

The 50,000th Liebherr wheel loader has rolled off the production line at Liebherr-Werk Bischofshofen GmbH. The anniversary machine, an L 566 XPower®, will be delivered to long-standing Liebherr customer Geiger Unternehmensgruppe. Geiger‘s Managing Partner Pius Geiger and Geiger Logistik’s Managing Director Gernot Beer travelled to Bischofshofen to pick up the anniversary wheel loader in person. Find out more

News | 04/10/2017

Liebherr planning new development and demonstration centre in Kirchdorf

Liebherr-Hydraulikbagger GmbH will invest over 30 million Euro in a new development and demonstration centre at the site in Kirchdorf over the next five years. Construction work is due to start in 2017 and is expected to be completed by 2021. Find out more

Press releases | 04/10/2017

Liebherr planning new development and demonstration centre in Kirchdorf

Liebherr-Hydraulikbagger GmbH will invest over 30 million Euro in a new development and demonstration centre at the site in Kirchdorf over the next five years. Construction work is due to start in 2017 and is expected to be completed by 2021. Find out more

Press releases | 03/31/2017

Liebherr Tower Cranes – everything from planning to dismantling from a single source

The Liebherr Tower Cranes Division planned and completed a job for a 1000 EC-H 50 Litronic in Schelklingen down to the very last detail. A new klinker production line is currently being built there whilst the cement works continues to operate normally. Find out more

News | 03/30/2017

Liebherr-Aerospace receives Silver Award from COMAC

On March 21st, 2017, COMAC honored Liebherr-Aerospace with the Silver Award for its performance in 2016. Find out more

  • Results per page