News & press releases

Filter reports

Period

Subject

Hits 141-150 of 466

Press releases | 09/27/2019

Two Liebherr mixing plants Betonmix 3.0 master concrete production at Brenner Base Tunnel

Two Liebherr Betomix 3.0 mixing plants produce concrete for the Brenner Base Tunnel major project. This is one of the most important infrastructure projects for Austria and the European Union. Find out more

Press releases | 09/26/2019

In Awe of the Volcano: Drilling in the Shadow of the Nevado del Tolima

The Colombian government’s “4G Toll Road Concession Program” is the largest project in Latin America for the development of the road infrastructure. It involves the expansion or maintenance of about 7000 km of roads as well as the erection of new bridges. On the east-west route from Ibagué to Cajamarca, the company Mincivil S.A. is relying on the drilling rig LB 36 from Liebherr. The alternative is significantly more laborious. Find out more

News | 09/18/2019

Innovation by Liebherr at Perumin 34 from September 1 to 20 2019

At Perumin 34 in Arequipa, Peru, the Liebherr Group presents three business lines: Mobile Cranes, Mining and Earth Moving Equipment. Find out more

News | 09/06/2019

INTUSI from Liebherr wins international design award for excellent user experience

The innovative, adaptive operating concept INTUSI received the international UX Design Award 2019 for excellent user experience. The user experience is a key issue of man-machine interaction systems and is increasingly the focus of research work due to the increasing networking of our everyday lives and the working world. The awards ceremony takes place today, 6 September 2019, at 5.45 pm at the global technology trade fair IFA in Berlin. Find out more

Press releases | 09/05/2019

Liebherr compact wheeled excavators at Maxpo 2019

At Maxpo 2019, Liebherr presents the A 914 Compact Litronic and the A 918 Compact Litronic from the range of compact wheeled excavators. Both machines comply with the requirements of the Stage IV exhaust emissions standard. Find out more

Press releases | 09/05/2019

Spotlight: the R 938 from the new generation of crawler excavators presented at the Maxpo 2019 trade fair

The new R 938 model is presented at Liebherr's trade fair stand at Maxpo 2019 alongside an engine, which meets Stage V emission standards. Like all models in the new generation, the Liebherr crawler excavator, launched in 2019, also boasts numerous improvements. Find out more

Press releases | 09/05/2019

Highest levels of productivity: Liebherr presents two wheel loaders at Maxpo 2019

At Maxpo 2019, Liebherr exhibits an L 550 XPower® from its latest large wheel loader generation. Liebherr XPower® is an integrated, innovative machine concept that sets new standards in terms of fuel efficiency, performance, robust design and comfort. Find out more

Press releases | 08/09/2019

Liebherr to Present its Latest Construction Machinery in Finland at the 2019 Maxpo

The Liebherr Group is present at Finland´s largest trade fair for construction machinery Maxpo, which is held from 5 to 7 September in Hyvinkää. On stand A 60, measuring 1.480 m2, Liebherr offers trade visitors a range of construction machinery from the fields of earthmoving, material handling and mobile cranes. Find out more

News | 08/08/2019

Visions of the Emirates: when the superlative becomes reality

Where oriental tradition and ultra-modern design merge - that’s where the building skills in the Emirates become apparent. The new port with almost 2 million square metres is proving to be a further prestige project in Dubai. Through the right choice of construction machinery, the company Keller Grundbau GmbH has managed to eliminate one costly time-consuming working process. Find out more

Press releases | 08/08/2019

Visions of the Emirates: when the superlative becomes reality

Where oriental tradition and ultra-modern design merge - that’s where the building skills in the Emirates become apparent. The new port with almost 2 million square metres is proving to be a further prestige project in Dubai. Through the right choice of construction machinery, the company Keller Grundbau GmbH has managed to eliminate one costly time-consuming working process. Find out more

  • Results per page