News & press releases

Filter reports

Period

Subject

Hits 1,611-1,620 of 3,392

Press releases | 08/06/2019

Liebherr MK 88 Plus as a space-saving miracle in the old city centre of Mainz

During the use of a Liebherr MK 88 Plus in the city centre of Mainz, the spontaneity of the crane driver and the flexibility of the mobile construction crane were essential: In very restricted space, crane requirements had been changed on site at short notice. Due to technical problems, an air conditioner had to be positioned on a different place on the roof of a commercial building at a greater distance to the crane. However, this was not possible from the planned place of installation because even from there, the maximum working radius had already been required for the lifting movement. Nevertheless, the team of the crane and heavy-duty logistics company Riga-Mainz found quickly a practicable solution for the new situation on site. Find out more

Press releases | 08/02/2019

Liebherr-Aerospace Celebrates Servicing of 5,000th Heat Exchanger

Only 30 months after Liebherr-Aerospace entered the Heat Exchanger maintenance market in 2016 with the opening of a dedicated Center of Excellence in Saline, Michigan (USA), the company was able to celebrate the delivery of its 5,000th heat exchanger unit. Find out more

News | 07/31/2019

100,000 operating hours and still going strong

Corporación NAVIOS owns and operates the largest independent bulk transfer and storage port facilities in Uruguay. Here, a Liebherr duty cycle crane type HS 871 HD unloads barges on their way from Bolivia, Paraguay and Brazil. With Liebherr as a reliable service partner the machine has just achieved a huge milestone – 100,000 operating hours - and still going strong! Find out more

Press releases | 07/29/2019

Vogel takes delivery of Liebherr LTM 1090-4.2 mobile crane

Dieter Vogel GmbH took delivery of an LTM 1090-4.2 at the Liebherr Plant in Ehingen. The new 90-tonne crane will replace an LTM 1080/1, which has been a reliable machine for 20 years for the crane rental company based in Reutlingen. Find out more

Press releases | 07/26/2019

Liebherr delivers second MK 140 mobile construction crane to Scholpp

The German crane company Scholpp Kran & Transport GmbH has taken delivery of another MK 140 Liebherr mobile construction crane – and thus extends its more than 70-strong fleet of cranes. Find out more

Press releases | 07/25/2019

Henneberger Schwerlast expands fleet with a Liebherr LTM 1250-5.1 mobile crane

Henneberger Schwerlast e.K. crane and logistics contractor took delivery of a new Liebherr LTM 1250-5.1 mobile crane in May. The 250 tonne machine is now the most powerful crane in the Thuringian crane rental company’s fleet. Find out more

News | 07/25/2019

Liebherr-Hausgeräte: Successful start to realignment of sales organisation

The realignment of the sales organisation launched at the beginning of 2019 has been a complete success for Liebherr household appliances. Find out more

Press releases | 07/25/2019

Closer to the customer with the newly established Liebherr-Hausgeräte company in Germany

Under the motto of “fit for the future”, the reorganisation of the sales organisation in Germany was completed at the beginning of 2019. Find out more

Press releases | 07/24/2019

Liebherr at IFA 2019 – Freshness meets passion

Liebherr-Hausgeräte is taking part in the International Consumer Electronics Fair (IFA) in Berlin from 6 to 11 September 2019. For 65 years, the fridge and freezer manufacturer has been passionate about meeting its customers’ requirements for ensuring food is stored at perfect freshness quality. This year’s motto is also entirely in keeping with this: ‘Your Food. Our Passion’. Find out more

Press releases | 07/23/2019

Hoisting over obstacles with Liebherr cranes – 108 tonne steel tank moved over 12 metre pipe bridge

Three large Liebherr mobile cranes were sent by crane and heavy haulage logistics contractor Maxikraft, which mainly operates in the east of Germany, to complete a tricky job at a chemical plant near Halle (Saale) – a storage tank weighing over 100 tonnes had to be transported from its assembly area through the factory site to its destination and then installed in the plant. The route through the factory site was blocked by a large pipe bridge. Find out more

  • Results per page