Zero emission
Lifting components is crucial in many industries. Doing the job emission-free even more important. The LR 1250.1 unplugged is another milestone in Liebherr's zero-emission construction machinery portfolio. A crane designed according to the requirements of our time.
Plugged in
In "socket operation", the performance of the crane is identical to that of the diesel-powered version.
Unplugged
Whether unplugged or plugged in, the working performance is identical. The range in unplugged operation enables crane operation for approx. 8 hours. Alternatively, the batteries supply sufficient energy for the erection of the main boom with luffing jib and travelling over a distance of about 650 metres.
Technical characteristics
Plugged in
No restrictions
Battery
Charging time: 2.25 hrs
Range: 8 hrs
System performance
255 kW electric
Lifting capacity
250 t
By clicking on “ACCEPT”, you consent to the data transmission to Google for this video pursuant to Art. 6 para. 1 point a GDPR. If you do not want to consent to each YouTube video individually in the future and want to be able to load them without this blocker, you can also select “Always accept YouTube videos” and thus also consent to the respectively associated data transmissions to Google for all other YouTube videos that you will access on our website in the future.
You can withdraw given consents at any time with effect for the future and thus prevent the further transmission of your data by deselecting the respective service under “Miscellaneous services (optional)” in the settings (later also accessible via the “Privacy Settings” in the footer of our website).
For further information, please refer to our Data Protection Declaration and the Google Privacy Policy.*Google Ireland Limited, Gordon House, Barrow Street, Dublin 4, Ireland; parent company: Google LLC, 1600 Amphitheatre Parkway, Mountain View, CA 94043, USA** Note: The data transfer to the USA associated with the data transmission to Google takes place on the basis of the European Commission’s adequacy decision of 10 July 2023 (EU-U.S. Data Privacy Framework).