3 minutes
Lifting operation in the Tatra Mountains
LR 1300 and LTM 1160-5.1 as tandem partner
Rebuilding of the bridge over the River Biala in Jankowa-Lipniczka, which was destroyed by flood in 2010.
Bridge replacement in Poland
The bridge over the River Biała in Jankowa-Lipniczka, which was destroyed by a flood in 2010, has now been rebuilt with the aid of Liebherr cranes.
Split into six bridge sections, material with a total weight of 116 t was installed 5 m above the river. The sections were delivered by low-loader from Skoczów, Silesia, pre-assembled on site, and then positioned through a tandem lift. Our customer IMB-Podbeskidzie completed the work in December 2017.
Assignment on the River Biala in Jankowa-Lipniczka
Three Liebherr machines were in operation:
- An LR 1300 crawler crane and a mobile crane type LTM 1160-5.1 were at hand for the lifting work,
- and the sheet piles were installed by a duty cycle crawler crane type HS 855 HD equipped with a vibratory hammer.