NEW HOSPITAL BUILDING

Job report – the positioning system LIPOS supports continuous flight auger drilling
liebherr-lipos-trimble-screen-monitor-3

Additional monitor with digital plan

The digital drilling plan could be transferred to the LIPOS positioning system in the Liebherr machine in no time.

In an additional screen, the driver sees jobsite data and pile lists as a template for work to be carried out.

liebherr-jobreport-oberwart-krankenhaus-sob-endlosschneckenbohren-lipos-positionierung-3

GPS manoeuvring

The operator sees his position with centimetre precision at all times.

01/02

Fast approach to the drilling points

The LIPOS positioning system played a decisive role in simplifying the work steps: without this system the drilling points would have to be newly measured, drawn and marked at least three times a day.
COMPARISONwith LIPOSwithout LIPOS
Drilling plan for the driverdigitalin paper form
Manoeuvring to the next drilling pointGNSS-guidedon sight
Ground markings for orientationnot necessarypeg irons, colour markings, sectional framework
Re-measure drilling pointsnot necessarymin. 3 x daily
liebherr-lipos-reference-point

“The LIPOS system has proven itself well on the jobsite. It makes working processes easier and allows continuous real time control and monitoring. Quality management is considerably improved through the automatic recording of the processes.

Drilling points can be quickly selected and the machine positioned. The system is basically self-explanatory for the operator and convinces through easy handling.”

Dipl.-Ing. Harald Fugger

Site Manager, Züblin Spezialtiefbau Ges.m.b.H.

liebherr-jobreport-lipos-managment

Real-time job info

All jobsite personnel has a clear overview at all times of exactly where the piles are, which piles are already completed and which still have to be done.

Further LIPOS jobsites

More than 1000 piles

The available land required substantial foundation work before it was able to support a whole hospital. In an area of 23,000 m², 1,310 piles had to be installed. All piles have a diameter of 630 mm and are being installed using the CFA (continuous flight auger) method. The maximum depth of the foundation piles was 16 m..

A LB 28 drilling rig was used, which was equipped with the LIPOS positioning system for the first time.